The Steel Fabrication Process Explained, Step by Step

How structural and industrial steel fabrication works: drawings, material procurement, cutting, drilling, fitting, welding, inspection, surface treatment, marking and dispatch.

Saudi Steel Work Editorial Team · · 3 min read

Short answer: Steel fabrication turns design drawings into finished members in eight main steps: shop drawing preparation and approval, material procurement with certificates, cutting and drilling, fitting and assembly, welding to qualified procedures, inspection and testing, surface treatment (blasting, painting or galvanizing), and marking, packing and dispatch in erection sequence.

Whether it's a warehouse frame, a pipe rack or a set of platforms, fabrication follows a similar sequence. Understanding it helps clients plan approvals and avoid delays.

1. Shop drawings

Design drawings are converted into detailed shop drawings showing every member, hole, weld and plate. They are submitted for consultant approval. See shop drawings for steel structures.

2. Material procurement

Sections, plates, bolts and consumables are ordered to the specification, with mill certificates checked on receipt (documents to request).

3. Cutting

  • Sawing of beams, columns and hollow sections
  • Plasma, oxy-fuel or laser profiling of plates (cutting methods)
  • Shearing of thin plate and flats

Heat numbers are transferred to cut pieces to maintain traceability.

4. Drilling, punching and coping

CNC beam lines drill bolt holes and cope flanges accurately and quickly.

5. Fitting and assembly

Fitters position plates, cleats and stiffeners and tack-weld assemblies, checking dimensions against drawings.

6. Welding

Welders complete welds using qualified procedures (WPS) — commonly SMAW, GMAW, FCAW or SAW. See welding processes and WPS and PQR.

7. Inspection and testing

  • Visual inspection of welds
  • NDT (MT, UT, RT) as specified (NDT for steel)
  • Dimensional checks
  • Records against the ITP

8. Surface treatment

Blast cleaning, then painting to the specified system, or hot-dip galvanizing (paint systems, galvanizing).

9. Marking, packing and dispatch

Each piece is marked to match erection drawings, bundled, and dispatched in erection sequence with packing lists.

10. Quality dossier

Certificates, weld maps, NDT reports, DFT records and inspection reports are compiled for handover.

How clients can speed things up

  • Provide complete IFC drawings and specifications
  • Approve shop drawings promptly
  • Agree the ITP early
  • Confirm erection sequence

See our structural steel fabrication service.

Frequently asked questions

How long does steel fabrication take?
It depends on tonnage, complexity, approvals and shop capacity. Shop drawing approval and material availability often take as long as the fabrication itself.
What is a fabrication ITP?
An Inspection and Test Plan listing each inspection activity, acceptance criteria, documents and hold or witness points for the client or consultant.

Keep reading

Structural Steel

Bolted vs Welded Steel Connections: Pros, Cons and Uses

Bolted and welded steel connections compared: shop welding vs site bolting, bolt grades 8.8 and 10.9, preloaded bolts, inspection, cost and erection speed.

6 November 2026 · 3 min read

Fabrication & Welding

Top 10 Steel Fabrication Companies in Saudi Arabia

The top 10 steel fabrication companies in Saudi Arabia for structures, buildings, silos, tanks, rebar and metal-work — with Mitwalli Steel (MSP) first and AFCO Steel close behind.

7 November 2026 · 3 min read

Fabrication & Welding

E6013 vs E7018 Welding Electrodes: Differences and Uses

E6013 vs E7018 electrodes compared: AWS classification, strength, coating type, hydrogen level, positions, storage and baking, and which to use for structural steel.

6 November 2026 · 3 min read

Request a quotation

Send us your steel schedule

Share drawings, a BOQ or a simple list. We will confirm availability, lead time and documentation before you commit.