Short answer: A WPS is the written instruction for how to make a weld: process, materials, consumables, joint design, positions, preheat and parameters. A PQR records the test weld and mechanical test results that prove the procedure produces sound welds. Welder qualification tests prove individual welders can make acceptable welds using that procedure.

Clients, consultants and inspectors ask fabricators for WPS, PQR and welder qualification records. Here's what each document is and why it matters.

WPS — Welding Procedure Specification

The recipe for a weld. It specifies:

  • Welding process (SMAW, GMAW, FCAW, GTAW, SAW)
  • Base metal grade and thickness range
  • Filler metal classification
  • Joint design and preparation
  • Positions
  • Preheat and interpass temperatures
  • Electrical parameters (current, voltage, travel speed)
  • Shielding gas
  • Post-weld heat treatment if needed

PQR — Procedure Qualification Record

The evidence. A test coupon is welded following the proposed WPS, then tested (tensile, bend, impact, macro, hardness as required). The PQR records the actual parameters and results. One PQR can support one or more WPSs within code limits.

Welder Performance Qualification (WPQ)

Each welder makes test welds under the WPS, which are inspected and tested. Successful welders are qualified for specific processes, positions, thickness and diameter ranges.

Common codes

Code Scope
AWS D1.1 Structural steel welding
ASME Section IX Pressure vessels and piping
API 1104 Pipelines
ISO 15614 / ISO 9606 Procedure and welder qualification (European/international)
EN 1090-2 Execution of steel structures

What clients should request

  • WPS for each joint type on the project
  • Supporting PQRs (or confirmation of prequalified status)
  • Welder qualification records with continuity logs
  • Consumable certificates and storage procedures

Why it matters

Qualified procedures and welders significantly reduce defects, repairs and NDT failures, and are mandatory under most project specifications.

See welding processes, NDT for steel and how to choose a fabrication company.

Frequently asked questions

What is a prequalified WPS?
Under AWS D1.1, certain procedures that follow specified limits are prequalified and do not need procedure testing, though they still must be written.
How long does welder qualification last?
Under common codes it remains valid while the welder continues using the process within set intervals, with records maintained by the employer.

Keep reading

Standards, Testing & Quality

NDT for Steel: VT, MT, PT, UT and RT Explained

Non-destructive testing methods for steel and welds explained: visual (VT), magnetic particle (MT), dye penetrant (PT), ultrasonic (UT) and radiography (RT) — what each finds and when to use it.

6 November 2026 · 3 min read

Standards, Testing & Quality

Charpy Impact Testing: What JR, J0, J2 and K2 Mean

Charpy V-notch impact testing explained: what toughness is, test temperatures, JR, J0, J2 and K2 subgrades in EN 10025, and when impact-tested steel is needed in Saudi Arabia.

6 November 2026 · 3 min read

Request a quotation

Send us your steel schedule

Share drawings, a BOQ or a simple list. We will confirm availability, lead time and documentation before you commit.