Service

Project steel sourcing and procurement support

Large projects buy dozens of steel items from several mills and stockists. Managing specifications, comparisons and deliveries in parallel consumes procurement time and introduces risk.

Scope of work

Send us your full steel schedule and we will consolidate the enquiry, compare available sources, and return a clear quotation with lead times and documentation for each line.

  • Bill of quantities review
  • Specification and standard alignment
  • Consolidated quotations by line item
  • Local vs. imported options and lead times
  • Documentation and certification requirements
  • Delivery scheduling to site

Deliverables

  • Line-by-line quotation
  • Lead time schedule
  • Documentation list per item

What we need from you

  • BOQ or material list
  • Specifications
  • Delivery location and dates

Process

How the work is delivered

  1. STEP 01

    Send your schedule

    Share the BOQ, specifications and delivery location.

  2. STEP 02

    Clarify

    Grades, standards and alternatives are clarified before pricing.

  3. STEP 03

    Quote

    A line-by-line quotation shows price basis, lead time and documents.

  4. STEP 04

    Deliver

    Deliveries are planned to your programme with documents per batch.

Related guides

Project Steel Sourcing: FAQs

Can I send a mixed list of steel items?
Yes. A full schedule is preferred — it allows consolidated delivery and better comparison.
Do you quote local content options?
Where locally produced options exist, quotations can indicate them, which may help with local content requirements such as those under LCGPA rules or IKTVA programmes.
What price basis is quoted?
Quotations state the basis — for example delivered to site or ex-works — with VAT shown separately as required in KSA.

Request a quotation

Plan your project steel sourcing project

Share drawings, a BOQ or a simple list. We will confirm availability, lead time and documentation before you commit.