Steel insights

Structural Steel

Beams, columns, sections, grades and structural design basics. 12 articles.

Structural Steel

Bolted vs Welded Steel Connections: Pros, Cons and Uses

Bolted and welded steel connections compared: shop welding vs site bolting, bolt grades 8.8 and 10.9, preloaded bolts, inspection, cost and erection speed.

6 November 2026 · 3 min read

Structural Steel

Pre-Engineered Buildings vs Conventional Steel Buildings

Pre-engineered buildings (PEB) vs conventional steel buildings compared: frames, steel weight, speed, cost, cranes, flexibility and which suits warehouses and factories in Saudi Arabia.

6 November 2026 · 3 min read

Structural Steel

Steel Angles: Equal and Unequal Angle Sizes and Uses

Steel angle sections explained: equal and unequal angles, designation, common sizes, weight formula, grades and uses for bracing, cleats, lintels, towers and frames.

6 November 2026 · 3 min read

Structural Steel

Steel Channels: UPN, UPE and PFC Sizes and Uses

Steel channel sections explained: UPN with tapered flanges, UPE and PFC with parallel flanges, American C-channels, typical sizes, weights and uses in fabrication.

6 November 2026 · 3 min read

Structural Steel

Steel vs Concrete Frames in Saudi Arabia: Pros and Cons

Steel vs reinforced concrete structures compared for Saudi projects: speed, cost, spans, weight, fire, corrosion, flexibility, labour and sustainability.

6 November 2026 · 3 min read

Structural Steel

Types of Structural Steel Sections Explained

A guide to structural steel sections: I-beams, H-beams, channels, angles, tees, hollow sections, plate girders and cold-formed sections, with typical uses in Saudi construction.

6 November 2026 · 3 min read

Structural Steel

Universal Beams vs Universal Columns (UB vs UC)

UB vs UC explained: British Standard BS 4-1 sections, shape differences, designations like 457×191×67 UB, typical uses and equivalents to IPE and HE sections.

6 November 2026 · 3 min read

Request a quotation

Send us your steel schedule

Share drawings, a BOQ or a simple list. We will confirm availability, lead time and documentation before you commit.